Colocation, matched to the workload.
Find space for your next GPU deployment, or list the capacity you have. FPX verifies both sides and introduces you only when there is a fit.
Or read the four site guides- 01Tell FPX what you need
Describe the power, geography and timing, or list the space you have.
- 02FPX checks both sides
Sites are verified and requirements qualified before anyone is introduced.
- 03Introduction on a fit
Suppliers hear about a requirement only after FPX qualifies it and you agree.
What a good site looks like, by workload.
FOUR GUIDES · NO TOOLS INSIDE
Guide 01GB300 NVL72 sites
Colocation sites for GB300 NVL72 deploymentsA pre-integrated, liquid-cooled 72-GPU rack that needs up to 142 kW. Few existing halls can take it; this is what to check before you tour one.
Guide 02B300 server sites
Colocation sites for B300 server deploymentsAn 8-GPU air-cooled server. Two per rack fits an ordinary hall; four per rack needs a DC bus bar and rear-door cooling.
Guide 03AI inference sites
What to look out for in an AI inference siteClose to users, always on, and able to grow in small steps across regions. Judge it the way you would judge production hosting.
Guide 04AI training sites
What to look out for in an AI training siteOne synchronised job needs one contiguous block of power, dense liquid cooling, and a grid that tolerates load swings.
Have a requirement in mind? Send it to FPX and we match it against verified capacity.
FIND COLOCATION →